CISDI: An active player in the construction of multiple benchmark projects
Date:2019/1/25 Source: CISDI
CISDI: An active player in the construction of multiple benchmark
projects
Since the 1990s
CISDI has seized the opportunities created by China’s blooming steel economy.
It has been responsible for the design and construction of multiple benchmark
projects and brought about numerous technological breakthroughs.
TISCO: The 1.50Mt/a stainless steel plant with the world’s largest
single-unit (BOF)-output
When TISCO’s
1.50Mt/a stainless steel plant was built, it was the largest of its kind in the
world and boasted the world’s largest stainless steel melting output created by
a single unit.
It was also
CISDI’s first and classic design for a stainless steel plant.
TISCO is a
leading representative of China’s stainless steel production upgrading and sets
benchmarks for top world levels.
The TISCO BOF
is producing smoothly
Bayi Steel’s 1,750mm hot strip mill: China’s first hot strip mill to be
package-supplied and built with a Chinese engineering company leading the
technology
CISDI undertook
the package supply of EIC (electric, instrumentation and computer), the hydraulic
servo system, software commissioning and the technical leadership for Bayi
Steel 1,750mm hot strip mill. It was the first time a Chinese hot strip mill
had been built utilising only Chinese skills and technology.
Bayi Steel
1,750mm hot strip mill running with a hot strip
Gerdau Acominas 1,750m3 blast furnace in Brazil - a Chinese
first
CISDI
package-supplied the 1,750m3 blast furnace for Gerdau Acominas in
Brazil. It was China’s first complete export of the core technologies and
equipment for a large blast furnace and the first export of its kind to South
America.
A night view of
the 1,750m3 blast furnace at Gerdau Acominas in operation