Arc of triumph: First step achieved for TISCO’s green stockyard
Date:2021/9/23 Source: CISDI
After 17 hours of toil, the first span of metal net frames which will enclose TISCO’s stockyard is now in place.
The enclosure needs to be around 36,400 square metres in size with a major span of 116.5 metres.
The stockyard is currently being rebuilt to enlarge its storage capacity and ensure safer production at the plant. CISDI was awarded the EPC-based contract for construction in March.
It is the latest in multiple successful enclosed rebuilds at TISCO’s stockyard to advance the plant’s green credentials - since 2016, the primary stockyard zone 1, 2 and 3 and the blending stockyard have been rebuilt by CISDI on an EPC basis.